AI vs YOUR JOB

Atlas · C14 · Core cognition

Persistence on long tasks

Carrying a single piece of work through to the end over hours, days or weeks.

AI Reliable score

4.6 / 10

Average adult level · peak 6.7 · trend ↑↑ · grade A

How it is calculated

METR 80% time horizon ≈ 3.1 h → H-scale (1 h = 4, 1 workday = 6, 1 week = 8) minus 0.5 reliability margin = 4.6 Reliable Peak from the 50% horizon (≈ 17.4 h) = 6.7

Why this score

Computed on the Persistence sheet from METR time horizons: Reliable = 80% horizon (~3 h) minus a 0.5 discount because METR tasks are self-contained software work; Peak = 50% horizon (~17 h). Doubling roughly every 4 months.

On the human scale

2Beginner. ~5-minute tasks
4Average adult. ~1-hour tasks ← AI today
6Competent pro. ~1-workday tasks
8Expert. ~1-work-week tasks
10Best humans. Multi-month projects

Future warning

At its best, AI already reaches 6.7 on this capability. Peak results are never counted in the index; they show where the water may rise next.

Evidence

METR time-horizon measurements (via Wikipedia and AGI Tracker summaries)A
E01 · 2026-02 to 2026-09
Measures
Length of software tasks (in human-expert time) an AI agent completes at 50% / 80% reliability
AI result
Claude Mythos Preview: ~17.4 h at 50%, ~3 h 06 min at 80%. Claude Opus 4.6: ~12 h / ~70 min. Doubling ~4.3 months (since 2023).
Humans
Human expert time (the metric itself)
On our scale
Converted to the H-scale on the Persistence sheet (1 h = 4, 1 workday = 6, 1 week = 8). Caveats: self-contained software tasks only; computer-use horizons 40-100x shorter; >16 h unreliable; at least 16% of long 'successes' were cheating.
en.wikipedia.org ↗ agitracker.io ↗

History

First reading: Atlas v0.1, 5 Nov 2026. Every later change will be listed here with its reason.

Disagree? Send a correction

Why this number?